![]() |
||
|
Junior Member
![]() ![]() ![]() 加入日期: Sep 2001 您的住址: 1342萬光年外
文章: 896
|
引用:
真糟.... 那麼前一個加入聯盟隊的是哪一個專案的隊伍?
__________________
|
||||||||
|
|
|
Elite Member
![]() ![]() ![]() ![]() ![]() 加入日期: Nov 2002 您的住址: 不正常人類研究中心
文章: 6,392
|
引用:
那就再拉一個團隊進來吧!
__________________
要用FurMark燒機請注意,作者建議跑15分鐘就好/電腦電源接頭規格 加入 F@H分散運算,幫助對抗疾病/ /加入WCG分散運算,幫助解決癌症,AIDS,糧食與能源問題 http://cid-d082ecba16a55988.skydriv...=GetSharingLink VGAMaster 請多多支持,歡迎任意轉貼!
|
|||
|
|
|
Junior Member
![]() ![]() ![]() 加入日期: Sep 2001 您的住址: 1342萬光年外
文章: 896
|
引用:
創一個目前沒在跑的專案團隊,再加入好了..
__________________
|
|
|
|
|
*停權中*
加入日期: Jul 2008 您的住址: 火星基地
文章: 488
|
引用:
建議先不要自創團隊, 改以尋求已經存在的團隊來加入比較好, 其實專案數量有限, 等整合接近尾聲後, 再來想辦法形成共識 另外,Raziel大大好像有創一個boinc-wide team, 不知可不可以從這�堣U手, 一勞永逸 |
|
|
|
|
Elite Member
![]() ![]() ![]() ![]() ![]() 加入日期: Dec 2006 您的住址: Taipei
文章: 8,344
|
原本BOINC wide team的用法, 是給同一個人(同mail address)創立多個專案隊伍時,
可以用來合併累計跨BOINC專案群的管理機制. 我使用來整合所有台灣隊伍的BOINC計分, 但是各專案創隊的人仍不是我, 而是各路的先進前輩, 所以我也沒有管理權. 小弟也沒有立場要各個專案創隊隊長轉移/分享管理權出來, 所以可能要找其他的方式來進行. ![]() |
|
|
|
Junior Member
![]() ![]() ![]() 加入日期: Sep 2001 您的住址: 1342萬光年外
文章: 896
|
https://secure.worldcommunitygrid.o...offset,0#252594
Greetings, We have starting a new BETA test for the next phase of a project. This phase is the next in Discovering Dengue Drugs - Together. This particular BETA is for the type A work units for this project/phase. You will see that some of the graphics are limited but this is due to the way graphics are designed. Also, there is a limited 440 work units that are going out for the type A's. There will be other BETA's that follow as we will need to test all of the types. Note: For this BETA half of the work units will run about 10 times shorter than the others, this is so we can get some initial results back to make sure things are working. Project work unit description. There are three major types of work units for this project. We describe these as being type A, B, and C. How to tell which type you have...You can tell if you have a type A by the work unit name. Near the end you will see something like *_ps0000. The ps is for the type A's. pe and se are for type B's. Type C's have more sq, sd, sr, pq, pd, pr, pc, pl. Type A - These work units are the largest of the work units for this project. These work units will run for an estimated 50 hours on average. This means that there will be some work units that run for possibly 100 hours. These work units also have the largest upload requirements as they will upload about 20MB of files back to the servers. The will check point 50 times in a run, so this means it could be an hour between checkpoints. The memory requirements for this type is also around 1.75GBytes. Now that i think most of the bad news is done, the good news is these work units will be the fewest in numbers and i will explain later. Type B - There are 2 branches the se and pe. The pe branch will have larger input files, meaning they will be downloading about 20 MB per work unit. The good news is these work units last about 5-10 hours in runtime with many more checkpoints in the middle. We have not determined the memory requirements for these but it should be less than the type A's. Type C - This is where a bulk of the project will be run. Again, the pq, pd, pr, pc, pl branches will have the larger downloads in comparison to the other. These downloads will be again near 20MB. These work units will be the shorter of the work units with runtimes near 2-4 hours each. Also many more checkpoints in the middle. -Uplinger 威力強大的 DDDT Phase 2 BETA (type A) 一個wu運算時需要220-230mb的記憶體 還要預先 撥1750mb的記憶體 且 與server間有384.00 kbps的下載速度才允許接收wu.... ![]() 建議32bit作業系統可用實體記憶體只有3G-3.5G下現在不要勾選運算beta專案, 實測只要同時運算3個以上此類型的wu, 就會錯的亂七八糟, 一天內錯8個wu,會被server 暫時ban掉,不允許收新的wu....... ![]() 小弟今天就被Ban了2台4核心.... ![]()
__________________
|
|
|
|
Elite Member
![]() ![]() ![]() ![]() ![]() 加入日期: Dec 2006 您的住址: Taipei
文章: 8,344
|
引用:
不用怕, 多收下來的beta DDDT WU, 一次只設定開啟一個來算, 其他暫止. 再多來都沒在怕的啦~ ![]() |
|
|
|
|
Junior Member
![]() ![]() ![]() 加入日期: Aug 2003 您的住址: 台中市
文章: 751
|
看來DDDT真不是一個好惹的東西
![]()
__________________
![]() |
|
|
|
Junior Member
![]() ![]() ![]() 加入日期: Sep 2001 您的住址: 1342萬光年外
文章: 896
|
引用:
Beta的WU有一個特性 如果同一Beta WU的副本有其他的機器運算完成回傳後, server會向其他收到此同一Beta WU副本的機器,針對該WU送出"Server Abort"訊息, 接著還沒運算的Beta WU就被Server強制回收了.. 所以暫停Beta WU手動開啟一次運算一個的方法, 會造成本來預計後面才要手動開啟運算的WU,還沒開啟運算就被強制回收... 小弟覺得還是等DDDT P2 Beta Type A結束在開始運算比較好, 免的機器趁小弟沒注意抓一堆WU來算, 不但全部運算錯誤白做工就算了, 機器還被BAN掉,強制休息一天.......
__________________
|
|
|
|
|
Junior Member
![]() ![]() ![]() 加入日期: Sep 2001 您的住址: 1342萬光年外
文章: 896
|
DDDT P2 Beta Type 又有狀況了
這回是"Aborted by project" ![]() 跟之前"Aborted by Server"的訊息不一樣, 可能Type A取消了..
__________________
此文章於 2009-10-07 10:44 PM 被 SHINN 編輯. |
|
|